In the Past, As a consortium, we have participated in Nigeria;
- Construction of a dedicated 132/33KV overhead wire, this construction was done with a distance of 44KM from the Egba injection substation in Owerri to Ngor Okpalla, transmitting it on a 2.5MVA transformer ring main circuit with 7 substation
- National Prepayment Metering Project – 2007 Yola DISCO/EMCON – 26,000
- World Bank/PMU PPM project for AEDC L+G Consortium – 2010-2011 – 117,000
- World Bank/PMU PPM project for KAEDCO/3C Consortium – 2014-2015 – 40,000
- SMART MD Meters Replacement for EEDC – CHRISEJIK Consortium – 2,890
- Supply, installation and maintenance of solar powered street light
- Design, Construction and commissioning of Electrical Power Reticulation system at the Victoria Integrated Agro Farms Limited Facility in Elelem Community in Ngor Okpala
In the Past, As a consortium, we have participated Globally;
- Rural Electrification Authority of Zambia: 2015-2017 Lusaka – 154,340 Pcs
- Supply and installation of LV MCBs REA, Zambia: 2015-2017 – 224,660 Pcs
- Supply and Installation for Ethiopian Electric Power Corporation: 2014 – 2016 – 324,300 Pcs
- MD Meters for Ethiopian PEC: 2014-2015 – 3,668 units
- Electricity Regulatory Authority of Uganda – 2015-2017 – 111,100 units
- Others in Indonesia, Philippines, Nepal Bangladesh, Malaysia, Vietnam